Help/Production & the floor/Put meetings, closures and leave on the Planner

Put meetings, closures and leave on the Planner

One month view of what is coming up for the whole shop.

What this is for

The Planner is a shared calendar for the things that are not jobs but still take time off the floor — a staff meeting, a public holiday, someone on leave, the shop closed for stocktake. Production sees them alongside the work.

Put meetings, closures and leave on the Planner — the screen in Sign OS
Put meetings, closures and leave on the Planner — walkthrough video

What is on this screen

Each part of the screen above, top to bottom, and what changing it affects.

← Previous · month · Next →
Move through months.
Add entry · + on a day
Open the entry form.
What is it?
Shop (Meeting, Event, Function, Closure, Other), Someone's away, Department entries, and your own kinds made with the Kinds button.
Kinds (toolbar)
Your own entry types, such as Trade show, Stocktake or Training, each with a colour every entry of that kind starts on. Renaming one renames every entry using it; removing one only takes it off the list. Shown to people who can change shop hours.
Who's away · Not saying
For leave; private if you like.
Minutes to deduct
Capacity taken out of the working day.
Colour · Notes
The pill colour and a note.
Pills on the grid
A public holiday is one entry per department shown as one pill.

Step by step

  1. 1

    Open Production → Planner. It shows one month; use Previous and Next to move.

  2. 2

    Click the + in a day, or Add entry at the top, and say What is it: a shop entry (Meeting, Event, Function, Closure, Other), Someone's away, or a Department entry such as a public holiday. Your own kinds appear here too.

  3. 3

    For someone away, pick who — or Not saying if it is private. For time taken out of the working day, set Minutes to deduct so capacity drops by that much.

  4. 4

    Give it a colour and a note if it helps, then save. Entries that affect capacity flow into the production timeline.

Open this in Sign OS →

Tips & gotchas

  • →A public holiday is one entry per department, shown as a single pill. That is deliberate: a department that works the holiday can have its entry removed on its own.
  • →Your own entry kinds — say 'Trade show' or 'Training' — are made with the Kinds button on the Planner toolbar, so everyone picks from the same list.
  • →Public holidays come from Settings → Production → Shop hours & calendar. Saving that page puts a removed one back.

Related guides

Set your shop hours, holidays & capacityYour time zone, working days and hours, and public holidays: the week the schedule is built on.Read the production timelineEvery job on the days and departments it needs, at any zoom.Clock on, and write up a day's workWhere the floor's hours come from, and how to add the ones nobody scanned.